Greece interconnector flow flips to net imports

interconnector_flip · IPTO (ENTSO-E) · medium severity

Data last updated:

What happened

Greece's net cross-border interconnector flow flipped to net imports (615 MW), from net exports (-1,048 MW) previously.

Metrics

IPTO (ENTSO-E) grid status

IPTO (ENTSO-E) grid status → · Full interactive dashboard →

All grid events