Czech Republic interconnector flow flips to net exports

interconnector_flip · CEPS (ENTSO-E) · medium severity

Data last updated:

What happened

Czech Republic's net cross-border interconnector flow flipped to net exports (-615 MW), from net imports (504 MW) previously.

Metrics

CEPS (ENTSO-E) grid status

CEPS (ENTSO-E) grid status → · Full interactive dashboard →

All grid events